ORIN successfully treated Benzene contaminated groundwater utilizing ORIN’s patented Bioavailable Absorbent Media (BAM). ORIN utilized DPT in order to effectively cover the injection area around MW-1 . A vacuum truck was utilized during chemical injection to remove highly contaminated groundwater and to provide hydraulic control. Eleven injection points received a combined total of 1,100 gallons of treatment chemistry.
The Challenge
The site presented specific treatment needs:
- High benzene concentration: 7.544 mg/L
- Site-specific target: 6.970 mg/L
- Single well focus area (MW-1)
- Need for precise treatment
- Regulatory compliance requirements
- Path to site closure
The Solution: Targeted BAM Implementation
The team executed a precise treatment strategy:
- Treatment Design:
- 11 strategic injection points
- 1,100 gallons total treatment volume
- DPT application methodology
- BAM technology deployment
- Focused area treatment
- Implementation Controls:
- Vacuum truck deployment
- Hydraulic control maintenance
- Contaminated water removal
- Treatment optimization
- Distribution verification
Impressive Results
The treatment exceeded all objectives:
- Initial concentration: 7.544 mg/L
- Target level: 6.970 mg/L
- Final result: Non-detect
- Achievement: 100% reduction
- Exceeded compliance goals
Path to Closure
Current status and next steps:
- Quarterly monitoring program
- Continued verification
- Progress toward closure
- Regulatory compliance tracking
- Long-term effectiveness confirmation
Key Success Factors
Several elements contributed to perfect results:
- Precise injection placement
- Strategic BAM application
- Effective hydraulic control
- Focused treatment area
- Comprehensive monitoring
Innovation Highlights
The project demonstrated several advantages:
- Complete contaminant elimination
- Exceeded treatment targets
- Efficient application
- Rapid results achievement
- Clear closure pathway
Practical Applications
This success provides solutions for:
- Focused area treatment
- High benzene concentrations
- Single well remediation
- Regulatory compliance
- Site closure preparation
This case study demonstrates how precise application of BAM technology can achieve perfect results in focused treatment areas.